Gansu electric cast |
Publisher:Yineng group Release time :2018/7/2 17:07:15 Click on the:1719 Shut down |
Started in 1979, making it hydropower station in 1980 to produce electricity.For making tie li county town making village self-governance of small hydropower station.The installed capacity of 25 mw, power generating capacity is 32 flows.In 1982 due to water shortage, power stations close.
Making plant design for water diversion type power station, the installed capacity of 25 kw, 15 m, design head design reference flow of 3.36 cubic meters/SEC (excluding agriculture, industry, ecological water use of 2.0 cubic meters/seconds), guarantee the output of 5 kw, for many years the average capacity 32 KWH, 2000 hours using h.For small river power station, dam, flushing hole is permanent buildings, into the hole, water diversion side weir, diversion tunnel, pressure forebay, pressure pipe, factory buildings, booster station. Main building by taking the dam, the side weir setting basin (and do), water diversion tunnel, pressure forebay, pressure pipes, discharge channel, workshop and office facilities.In the engineering construction will also enable abandon slag field, temporary construction sites, temporary road and other projects.Project by the first hub area, water diversion project, power plant, office temporary living quarters, abandon slag field, construction site, construction of temporary road and construction of the camp.
|
|