Add:No. 508 Ganglong Road, Economic Development Zone, Yangzhong City, Jiangsu Province (212213 )
    Tel: 0511-88219009
    E-mail:sales@jsyineng.com

Tianjin LNG

Publisher:Yineng group Release time :2018/7/3 8:55:08 Click on the:1657 Shut down


This project includes a full capacity 160000 m3 tank of concrete LNG storage tank EPC and terminal design, the pile foundation engineering, including 1 160000 square tank engineering pile.Engineering pile using bored piles construction technology.Engineering pile, a total of 480 root, pile diameter 1.2 m, an average of 56 m pile length.1 m 2448 root gravel pile, pile diameter, pile length of 7 m.Specific work includes engineering pile construction, gravel pile construction, project management, offers the talent in the field of construction machine, overlay and related facilities, and other management and coordination.